The Saga Pearl II is in the middle of a routine drydocking at Damen Shiprepair in Vlissingen, Holland, utilizing the yard’s state-of-the-art enclosed drydock.
Saga said the ship will undergo extensive exterior maintenance and receive a new paint job.
Inside, new carpeting is planned for public areas. On the technical side, work areas include the engine room, galley, electrical systems and more.
The ship arrived at the yard on April 12, and maneuvered into the drydock with the assistance of two tugboats after lowering and releasing all lifeboats.